Profitability for INTEL XEON E5-2660 V0
Calculated for
1 BTC = $ 17231.5
Profit / Day
$ -0.39
Mined / day
0.00 BTC
Power cost / Day
$ 0.39456
Profit / Week
$ -2.76
Mined / Week
0.00 BTC
Power cost / Week
$ 2.76
Profit / Month
$ -11.84
Mined / Month
0.00 BTC
Power cost / Month
$ 11.84
Profit / Year
$ -144.01
Mined / Year
-0.01 BTC
Power cost / Year
$ 144.01
Disclosure: Mining metrics are calculated based on a network hash rate of 94,518 GH/s and using a BTC - USD exchange rate of 1 BTC = $ 17231.5..Block reward is fixed at 0 BTC and future block reward reductions are not taken into account. The average block time used in the calculation is 0 seconds. The electricity price used in generating these metrics is $ 0.12 per kWh.

Your opinion about the INTEL XEON E5-2660 V0