Profitability for Geforce 1080 G1
Calculated for
1 ZEC = $ 168.907
Profit / Day
$ 0.68
Mined / day
0.00 ZEC
Power cost / Day
$ 0.36288
Profit / Week
$ 4.75
Mined / Week
0.03 ZEC
Power cost / Week
$ 2.54
Profit / Month
$ 20.34
Mined / Month
0.12 ZEC
Power cost / Month
$ 10.89
Profit / Year
$ 247.49
Mined / Year
1.47 ZEC
Power cost / Year
$ 132.45
Disclosure: Mining metrics are calculated based on a network hash rate of 94,518 GH/s and using a ZEC - USD exchange rate of 1 ZEC = $ 168.907..Block reward is fixed at 0 ZEC and future block reward reductions are not taken into account. The average block time used in the calculation is 0 seconds. The electricity price used in generating these metrics is $ 0.12 per kWh.

Your opinion about the Geforce 1080 G1