Profitability for Antminer A3
Calculated for
1 SC = $ 0.0107828
Profit / Day
$ 15.65
Mined / day
1451.78 SC
Power cost / Day
$ 3.41568
Profit / Week
$ 109.58
Mined / Week
10162.45 SC
Power cost / Week
$ 23.91
Profit / Month
$ 469.63
Mined / Month
43553.37 SC
Power cost / Month
$ 102.47
Profit / Year
$ 5713.80
Mined / Year
529899.28 SC
Power cost / Year
$ 1246.72
Disclosure: Mining metrics are calculated based on a network hash rate of 94,518 GH/s and using a SC - USD exchange rate of 1 SC = $ 0.0107828..Block reward is fixed at 0 SC and future block reward reductions are not taken into account. The average block time used in the calculation is 0 seconds. The electricity price used in generating these metrics is $ 0.12 per kWh.

Your opinion about the Antminer A3