Profitability for AntMiner S9

Calculated for
1 BTC = $ 121961
1 BTC = $ 121961
Profit / Day
$
6.06
Mined / day
0.00 BTC
Power cost / Day
$
3.96
Profit / Week
$
42.44
Mined / Week
0.00 BTC
Power cost / Week
$
27.72
Profit / Month
$
181.88
Mined / Month
0.00 BTC
Power cost / Month
$
118.80
Profit / Year
$
2212.91
Mined / Year
0.02 BTC
Power cost / Year
$
1445.40
Disclosure: Mining metrics are calculated based on a network hash rate of 94,518 GH/s and using a BTC - USD exchange rate of 1 BTC = $ 121961..Block reward is fixed at 0 BTC and future block reward reductions are not taken into account. The average block time used in the calculation is?=$lg[59];> 0 seconds. The electricity price used in generating these metrics is $ 0.12 per kWh.