Profitability for AntMiner S7

Calculated for
1 BTC = $ 109439
1 BTC = $ 109439
Profit / Day
$
-0.69
Mined / day
0.00 BTC
Power cost / Day
$
3.72384
Profit / Week
$
-4.80
Mined / Week
0.00 BTC
Power cost / Week
$
26.07
Profit / Month
$
-20.90
Mined / Month
0.00 BTC
Power cost / Month
$
111.72
Profit / Year
$
-250.12
Mined / Year
0.00 BTC
Power cost / Year
$
1359.20
Disclosure: Mining metrics are calculated based on a network hash rate of 94,518 GH/s and using a BTC - USD exchange rate of 1 BTC = $ 109439..Block reward is fixed at 0 BTC and future block reward reductions are not taken into account. The average block time used in the calculation is?=$lg[59];> 0 seconds. The electricity price used in generating these metrics is $ 0.12 per kWh.