Profitability for S11 SiaMaster
Calculated for
1 SC = $ 0.0046621
Profit / Day
$ 0.42
Mined / day
89.17 SC
Power cost / Day
$ 3.9744
Profit / Week
$ 2.91
Mined / Week
624.20 SC
Power cost / Week
$ 27.82
Profit / Month
$ 12.47
Mined / Month
2675.15 SC
Power cost / Month
$ 119.23
Profit / Year
$ 151.74
Mined / Year
32547.63 SC
Power cost / Year
$ 1450.66
Disclosure: Mining metrics are calculated based on a network hash rate of 94,518 GH/s and using a SC - USD exchange rate of 1 SC = $ 0.0046621..Block reward is fixed at 0 SC and future block reward reductions are not taken into account. The average block time used in the calculation is 0 seconds. The electricity price used in generating these metrics is $ 0.12 per kWh.