Profitability for S11 SiaMaster
Calculated for
1 SC = $ 0.00120877
Profit / Day
$ -2.84
Mined / day
-2346.31 SC
Power cost / Day
$ 3.9744
Profit / Week
$ -19.85
Mined / Week
-16424.15 SC
Power cost / Week
$ 27.82
Profit / Month
$ -85.08
Mined / Month
-70389.22 SC
Power cost / Month
$ 119.23
Profit / Year
$ -1035.19
Mined / Year
-856402.23 SC
Power cost / Year
$ 1450.66
Disclosure: Mining metrics are calculated based on a network hash rate of 94,518 GH/s and using a SC - USD exchange rate of 1 SC = $ 0.00120877..Block reward is fixed at 0 SC and future block reward reductions are not taken into account. The average block time used in the calculation is 0 seconds. The electricity price used in generating these metrics is $ 0.12 per kWh.

Your opinion about the S11 SiaMaster