Profitability for L-One

Calculated for
1 AUR = $ 0.450945
1 AUR = $ 0.450945
Profit / Day
$
5.95
Mined / day
13.21 AUR
Power cost / Day
$
7.488
Profit / Week
$
41.68
Mined / Week
92.44 AUR
Power cost / Week
$
52.42
Profit / Month
$
178.65
Mined / Month
396.16 AUR
Power cost / Month
$
224.64
Profit / Year
$
2173.54
Mined / Year
4819.97 AUR
Power cost / Year
$
2733.12
Disclosure: Mining metrics are calculated based on a network hash rate of 94,518 GH/s and using a AUR - USD exchange rate of 1 AUR = $ 0.450945..Block reward is fixed at 0 AUR and future block reward reductions are not taken into account. The average block time used in the calculation is?=$lg[59];> 0 seconds. The electricity price used in generating these metrics is $ 0.12 per kWh.