Profitability for EBIT E11++
Calculated for
1 BTC = $ 112977
Profit / Day
$ 23.48
Mined / day
0.00 BTC
Power cost / Day
$ 5.7024
Profit / Week
$ 164.34
Mined / Week
0.00 BTC
Power cost / Week
$ 39.92
Profit / Month
$ 704.32
Mined / Month
0.01 BTC
Power cost / Month
$ 171.07
Profit / Year
$ 8569.21
Mined / Year
0.08 BTC
Power cost / Year
$ 2081.38
Disclosure: Mining metrics are calculated based on a network hash rate of 94,518 GH/s and using a BTC - USD exchange rate of 1 BTC = $ 112977..Block reward is fixed at 0 BTC and future block reward reductions are not taken into account. The average block time used in the calculation is 0 seconds. The electricity price used in generating these metrics is $ 0.12 per kWh.

Your opinion about the EBIT E11++