Profitability for SP50

Calculated for
1 BTC = $ 116887
1 BTC = $ 116887
Profit / Day
$
27.75
Mined / day
0.00 BTC
Power cost / Day
$
47.7216
Profit / Week
$
194.27
Mined / Week
0.00 BTC
Power cost / Week
$
334.05
Profit / Month
$
832.57
Mined / Month
0.01 BTC
Power cost / Month
$
1431.65
Profit / Year
$
10129.60
Mined / Year
0.09 BTC
Power cost / Year
$
17418.38
Disclosure: Mining metrics are calculated based on a network hash rate of 94,518 GH/s and using a BTC - USD exchange rate of 1 BTC = $ 116887..Block reward is fixed at 0 BTC and future block reward reductions are not taken into account. The average block time used in the calculation is?=$lg[59];> 0 seconds. The electricity price used in generating these metrics is $ 0.12 per kWh.